Prefab System Types:
Panelized Prefab
Volumetric Prefab
Combination systems
Prefab Delivery Process
Overview
The Prefab project delivery process often includes a palette of standardized building modules that are pre-arranged and configured to meet your project programmatic requirements. While modules are standardized in overall size, a wide array of design solutions are possible – design flexibiity with standardized components brings efficiency, affordability, speed and quality to the entire project process. Reduced design, permitting and construction times result in earlier move-in. A Prefab process is in stark contrast to the traditional design, permitting and construction process. Traditional construction methods are inherently and largely non-predictable with many change orders and surprises incurred at every step oft he process. Conversely, a Prefab solution brings predictability to an otherwise non-predicatable process. The following outline of project PHASES can be contracted singularly or collectively depending upon the respective Prefab company and your comfort level/preference.
Phase 1 - Feasibility Report & Study
Phase 2 - Test Fit & Training
Phase 3 - Design Development & Permitting
Phase 4 - Fabrication & Site Development
Phase 5 - Transport, Install & Build Out
Phase 6 - Project Completion